dc.contributor.author | Paijit Pawan and Thammasak Rujirayanyong | en_US |
dc.date.accessioned | 2019-07-14T15:31:28Z | - |
dc.date.available | 2019-07-14T15:31:28Z | - |
dc.date.issued | 2019-04-26 | - |
dc.identifier.citation | Paijit Pawan RSU International Research Conference 2019 Track Work Construction Scheduling using Linear Scheduling Method | en_US |
dc.identifier.uri | http://dspace.spu.ac.th/handle/123456789/6330 | - |
dc.description.abstract | This study aimed to integrate risk event occurred in tunnel construction and calculate contingency | en_US |
dc.language.iso | en | en_US |
dc.publisher | RSU International Research Conference 2019 | en_US |
dc.subject | monte carlo simulation, tunnel construction, precedence diagramming method (PDM), risk | en_US |
dc.title | Contingency Estimation based on Risk Events of Tunnel Construction : Case study Nam Thuen 1 Hydropower Project | en_US |
dc.type | Article | en_US |
Appears in Collections: | EGI-05. บทความที่ประชุมวิชาการ (ระดับชาติ) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
190704 Contingency Estimation Based on Risk Events of Tunnel Construction Case study Nam Thuen 1 Hydropower Project.pdf | 473.06 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.