Paijit Pawan and Thammasak Rujirayanyong2019-07-142019-07-142562-04-26Paijit Pawan RSU International Research Conference 2019 Track Work Construction Scheduling using Linear Scheduling Methodhttp://dspace.spu.ac.th/handle/123456789/6330This study aimed to integrate risk event occurred in tunnel construction and calculate contingencyenmonte carlo simulation, tunnel construction, precedence diagramming method (PDM), riskContingency Estimation based on Risk Events of Tunnel Construction : Case study Nam Thuen 1 Hydropower ProjectArticle