Browsing by Subject monte carlo simulation, tunnel construction, precedence diagramming method (PDM), risk
Showing results 1 to 1 of 1
Issue Date | Title | Author(s) |
---|---|---|
26-April-2019 | Contingency Estimation based on Risk Events of Tunnel Construction : Case study Nam Thuen 1 Hydropower Project | Paijit Pawan and Thammasak Rujirayanyong |