Title: Contingency Estimation based on Risk Events of Tunnel Construction : Case study Nam Thuen 1 Hydropower Project
Authors: Paijit Pawan and Thammasak Rujirayanyong
Keywords: monte carlo simulation, tunnel construction, precedence diagramming method (PDM), risk
Issue Date: 26-April-2019
Publisher: RSU International Research Conference 2019
Citation: Paijit Pawan RSU International Research Conference 2019 Track Work Construction Scheduling using Linear Scheduling Method
Abstract: This study aimed to integrate risk event occurred in tunnel construction and calculate contingency
URI: http://dspace.spu.ac.th/handle/123456789/6330