Title: | Contingency Estimation based on Risk Events of Tunnel Construction : Case study Nam Thuen 1 Hydropower Project |
Authors: | Paijit Pawan and Thammasak Rujirayanyong |
Keywords: | monte carlo simulation, tunnel construction, precedence diagramming method (PDM), risk |
Issue Date: | 26-April-2019 |
Publisher: | RSU International Research Conference 2019 |
Citation: | Paijit Pawan RSU International Research Conference 2019 Track Work Construction Scheduling using Linear Scheduling Method |
Abstract: | This study aimed to integrate risk event occurred in tunnel construction and calculate contingency |
URI: | http://dspace.spu.ac.th/handle/123456789/6330 |
Appears in Collections: | EGI-05. บทความที่ประชุมวิชาการ (ระดับชาติ) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
190704 Contingency Estimation Based on Risk Events of Tunnel Construction Case study Nam Thuen 1 Hydropower Project.pdf | 473.06 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.