Please use this identifier to cite or link to this item: http://dspace.spu.ac.th/handle/123456789/6329
Full metadata record
DC FieldValueLanguage
dc.contributor.authorThammasak Rujirayanyong and Paijit Pawanen_US
dc.date.accessioned2019-07-14T15:31:06Z-
dc.date.available2019-07-14T15:31:06Z-
dc.date.issued2019-04-26-
dc.identifier.citationPaijit Pawan RSU International Research Conference 2019 Track Work Construction Scheduling using Linear Scheduling Methoden_US
dc.identifier.urihttp://dspace.spu.ac.th/handle/123456789/6329-
dc.description.abstractRailway projects have been increased recently in Thailand but the scheduling method used by contractors of this kind of project was not appropriate based on the nature of activity in project . Linear scheduling method (LSM) was reviewed and applied to schedule a project case study. The case study was a conventional railways ballast track project. Data related to construction are collected such as method statement and production rate and case study of 20-kilometer day. Feedbacks and comments from contractor were positive when compared with current schedule technique used by a contractor as a project plan can be displayed distance and production rate consequently macro view and micro view of a project are provided.en_US
dc.language.isoenen_US
dc.publisherRSU International Research Conference 2019en_US
dc.subjectscheduling, railway, linear scheduling, track worken_US
dc.titleTrack Work Construction Scheduling using Linear Scheduling Methoden_US
dc.typeArticleen_US
Appears in Collections:EGI-05. บทความที่ประชุมวิชาการ (ระดับชาติ)

Files in This Item:
File Description SizeFormat 
190704 Track Work Construction Scheduling using Lincar Scheduling Method.pdf399.73 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.