กรุณาใช้ตัวระบุนี้เพื่ออ้างอิงหรือเชื่อมต่อรายการนี้: http://dspace.spu.ac.th/handle/123456789/6329
ชื่อเรื่อง: Track Work Construction Scheduling using Linear Scheduling Method
ผู้แต่ง/ผู้ร่วมงาน: Thammasak Rujirayanyong and Paijit Pawan
คำสำคัญ: scheduling, railway, linear scheduling, track work
วันที่เผยแพร่: 26-เมษายน-2019
สำนักพิมพ์: RSU International Research Conference 2019
แหล่งอ้างอิง: Paijit Pawan RSU International Research Conference 2019 Track Work Construction Scheduling using Linear Scheduling Method
บทคัดย่อ: Railway projects have been increased recently in Thailand but the scheduling method used by contractors of this kind of project was not appropriate based on the nature of activity in project . Linear scheduling method (LSM) was reviewed and applied to schedule a project case study. The case study was a conventional railways ballast track project. Data related to construction are collected such as method statement and production rate and case study of 20-kilometer day. Feedbacks and comments from contractor were positive when compared with current schedule technique used by a contractor as a project plan can be displayed distance and production rate consequently macro view and micro view of a project are provided.
URI: http://dspace.spu.ac.th/handle/123456789/6329
ปรากฏในกลุ่มข้อมูล:EGI-05. บทความที่ประชุมวิชาการ (ระดับชาติ)

แฟ้มในรายการข้อมูลนี้:
แฟ้ม รายละเอียด ขนาดรูปแบบ 
190704 Track Work Construction Scheduling using Lincar Scheduling Method.pdf399.73 kBAdobe PDFดู/เปิด


รายการทั้งหมดในระบบคิดีได้รับการคุ้มครองลิขสิทธิ์ มีการสงวนสิทธิ์เว้นแต่ที่ระบุไว้เป็นอื่น