School of Engineering
URI ถาวรสำหรับชุมชนนี้
เรียกดู
กำลังเรียกดู School of Engineering โดย ผู้เขียน "Denchai Woradechjumroen"
ตอนนี้กำลังแสดง1 - 7 ของ 7
ผลลัพธ์ต่อหน้า
ตัวเลือกเรียงลำดับ
รายการ BIM utilization for the operation and renovation enhancement of chiller plant manager system performance(2565-11-04) Denchai Woradechjumroen; Somkiat Sohab-รายการ Evaluation of CPMS installation and performance for energy savings(Department of Mechanical Engineering, Faculty of Engineering, King Mongkut’s University of Technology Thonburi (KMUTT), 2565-12-13) Denchai Woradechjumroen; ์Nontawat MoonsriA large building or a factory with an open office area is commonly used for a centralized chiller plant system (CPS), including a chiller, chilled water pump, condensing pump, and cooling tower. A centralized control system called chiller plant management system (CPMS) has been installed to reduce complex operations and allow the system to operate according to the settings for appropriate working time. Even though there is an installation guide from developing countries, installing hardware and software in Thailand still lacks clear standards or guidelines. As a result, the communication speed between the control system and the device is inappropriate. It leads to restrictions on data transmission and difficulty assessing performance with appropriate data. As a guideline for future development, this research proposes development for evaluating hardware, software and CPMS performance (characteristic quantity (CQ) and heat balance). It is divided into hardware checks according to aggregate communication and sub-communication to obtain adequate data for the system performance evaluation. The guidelines have been developed by recommended equipment manufacturers widely used in Thailand. It is used in three large-scale commercial buildings. It was found that the communication device supports data transmission every 15 minutes, there is no communication signal interruption, and the software system is suitable for recording CPS data to support: (1) energy-saving assessment and (2) process of ecU9zzVtYvaluating the performance of the CPS system in terms of CQ analysis and heat balance theory. The finding process can be used to evaluate exiting CPMS performance before the improvement.รายการ Modern Technologies for energy optimization(2566-02-14) Denchai Woradechjumroenรายการ Preliminary Development of Retuning Process for Energy Savings in Thailand(Faculty of Architecture and Planning, Thammasat University, 2566-06-21) Denchai WoradechjumroenThe retro-commissioning process has been energy-saving, around 20% on average in the United States. However, it has not been intensively used due to the cost-prohibitive issue of improving the building's existing air conditioning system to make it more efficient, which consists of the cost of the measurement system, replacing more efficient equipment, the cost of pre-and post-improvement inspections, resulting in a payback of more than three years. To solve the above problem, the Pacific Northwest National Laboratory (PNNL), a national laboratory under the control of the United States Department of Energy, has carried out designing a new process called re-tuning process; the process emphasizes correcting the original control system of the building, efficient use of building resources while remaining only the labour cost of adjusting the correct control system resulting in savings about 5 – 30% and low investment. The process can be performed every three years when building operations have improper operations. This research analyses and develops the retuning process applied in Thailand using the BAS data framework by analysing three main constraints, which are 1) CPMS (chiller plant manager system) guide, 2) AHU (air-handing unit) guide, and 3) zone guide to finding limitations of re-tuning to Thailand. Due to data and connectivity limitations of the BAS systems, the new process includes five steps of chiller operations. This tool can modify a CPMS system and lead to energy savings when existing systems are corrected by the tool to achieve an average of 5% energy savings for the chiller power consumption.รายการ Smart Chiller Plant(2566-04-25) Denchai Woradechjumroenรายการ แนวทางการกำหนด LOD สำหรับงาน MEP เพื่อการใช้งานในประเทศไทย(2565-11-04) Denchai Woradechjumroenรายการ แนวทางการกําหนด LOD สําหรับงาน MEP เพื(BIM Object สมาคม TBIM, 2566-02-21) Denchai Woradechjumroenจากปัญหาความซับซ้อนของวิศวกรรมงานระบบประกอบ (mechanical, electrical and plumbing, MEP) อาคารที่มากกว่าในอดีตส่งผลต่อปัญหาการประสานงานตั้งแต่การออกแบบจนถึงการติดตั้งร่วมกับงานสถาปัตยกรรมและงานโครงสร้าง เทคโนโลยีแบบจำลองสารสนเทศ (Building Information Modeling, BIM) ได้ถูกนำมาประยุกต์เพื่อแก้ปัญหาการซ้อนทับของงาน และเพิ่มประสิทธิภาพการทำงานร่วมกันให้มีความรวดเร็วมากขึ้น โดยกระบวนการ BIM สามารถลดการทำงานที่ซ้ำซ้อน และควบคุมกระบวนการต่างๆให้สอดคล้องและถูกต้อง ในประเทศที่พัฒนาแล้ว ระบบ BIM ได้มีการใชเพื่อลดขั้นตอนความผิดพลาดอย่างแพร่หลายโดยมีปัจจัยหลักที่ต้นทุนงานก่อสร้างที่สูงมากกว่าประเทศกำลังพัฒนาหลายเท่าตัว นอกจากนี้ยังมีมาตรฐานที่ได้ตกลงร่วมกันเพื่อง่ายต่อส่งการส่งต่อข้อมูลในรูปแบบของ open BIM ได้อย่างมีประสิทธิภาพ โดย Level of development (LOD) เป็นหนึ่งในเครื่องมือที่มีความสำคัญต่อการกำหนดความละเอียดของรูปทรงเลขาคณิต (LOD-G) และความละเอียดของข้อมูล (LOD-I) ในรูปแบบของ BIM object ที่สามารถนำไปใช้งานระหว่างกระบวนการทำงานตั้งแต่การออกแบบจนถึงการส่งมอบงานบริหารทรัพยากรอาคาร โดย LOD-I มีประโยชน์ในการกำหนดข้อมูลที่จำเป็นในแต่ละกระบวนการทำงาน เช่น ข้อมูลการออกแบบจะอยู่ในทุกระดับของ LOD ทั่วไป หากแต่ข้อมูลผู้ผลิตอาจจะจำเป็นตั้งแต่ระดับ LOD-400 ขึ้นไป ตามแนวทางของ CIC Building Information Modeling Standard เป็นต้น